I don't understand the use of a project's option setting. I hope you will help me out .. The problem is,,,,?
Project's option setting=== (check) pause the project after (100) submission, ahead.. there are four option in the same line 1) submission for (30) minute, 2) verification for , 3) verification reached in a day 4) submission is reached in a day .... what's the use of these four option.. kindly tell me in detail and what are the benefits of using them one by one !!! And i set automatically time 1100 .. is it right?
This is its screenshots====>>
Comments
Use 'submitted in a day'.
Because you use multiple threads, and because they don't know what each other is doing at the moment, and because verification doesn't happen right away - and may happen at the end of the day - you will likely greatly overshoot your target linkbuilding. Then you will be mad. So only use submitted in a day.
Get a feel for how many verifieds result from 100 submitted per day. Then you can always tweak the # of submitted.
'When to Verify' you can leave on Automatic, but leave it at '1440'.
Lot's to learn about this pretty amazing piece of software.
Noob! - Thats' me name
You have your pile of verified links, but at any time, they can be moderated and removed, or in the case of comments, they can roll off that page.
Now, assume you are building tiered links underneath those links. What if they are already gone? You have wasted linkbuilding underneath to links that no longer exist.
You now have two ways to re-verify links in a project:
a) Right click on project>Show urls>verified>verify
or
b) Check that box
Many will opt to not check that box as it could slow down ser from posting fast. Others check that box only on their top tier as every tier underneath depends on those top tier links being alive.
The choice is yours.
@ Simon, Thanks for asking the question in the first place