How can I best set up a quick project in GSA?
Hello, GSA peepz. Hope you are all having a great Summer! :pirate:
My question is: How can I quickly make a project?
In the past, it required writing descriptions (250,450) and all other fields. For some, also articles.
And then spinning them all.
I used the White Hat Box Spinner Chief spinning program, but it required a lot of checking by hand afterwards. This is all very time consuming.
How can I quickly set up a project?
I'd like to be able to set up Tier 2 or 3 that are not as important projects faster.
Thanks.
Comments