I"m getting consistent problems when running projects in a scheduler I"ve got tier 1 projects to pause after say 100 submissions reached in a day. but i find GSA continues to submit. do you guys fin the same issue at all?
I am having the same problem. I have set up numerous projects about 30 in all that are tier 1 and they are all set to pause after 5 submissions per day. Most of them seem to be doing this apart from a couple which have already submitted over 600 links. These projects were all set up on Monday, so really they should have 15 - 30 submissions each
Sorry Sven. All the projects have the same set up but this one
Guest Beds - Tier 1:
Still seems to be going. Over 3 days it has submitted to over 600 and there is nothing in the log to show it is on pause. I have just checked now and it has now paused so I am trying to look at the log to see what it says
The 7 submissions in the log window are only successfull submissions, the 150 in the project window count all actions on a site (login, registration...), maybe for some reason you can't complete the submission process.
That would make sense however it is showing me 200 verified links. Which means they are submitting. Most of the projects are working fine and pausing it is just a few that don't seem to be playing ball. They are a copied from one template so they are all identical.
Yes they are expanded. If it would help @Ozz I can give you remote access to the VPS as you seem very trusting or @Sven.
As I said most of them seem fine it it just a couple that are not right I started all projects at the same time on Monday. Most of them are showing between 3 and 5 verified and then there are a couple that are showing 100's of verified links.
Comments
On that log everything is fine for me. Project stopped with line...
"Project on pause for 664 more minutes as 1 submissions have been reached"
just verification is done here...so unless you have another log showing something different Im not sure whats wrong here.