I have about 190 projects and i want to use the scheduler to run 30 at a time. What would be the best settings? I tried several and the projects do not stop as they should.

I have 

"pause on x submited in a day"
verifications at 1440 minutes.

And i run the scheduler like this:

All with status active

30 projects at a time switch after 15 minutes

check the box: stop active(paused) projects.


The issue is that some of the projects pause but as soon as the scheduler gets to them again they restart, while if i run all the projects normally, they pause and they remain paused until next day.

Are there optimal settings to make sure that the scheduler doesn't go passed the submitted in a day quota?

Thanks in advance