Project stopped earlier than expected
Hi,
I had set up a campaign with option to stop campaign after getting 10 verified links per day per URL. This is my T3 campaign.
T2 project has 925 verified links. Therefore, I was expected this campaign to generate 925*10 = 9250 verified links before stopping.
After running for 5 hours the campaign stopped with message "Project on pause for 629 more minutes as 8385/8343 verifications have been reached". This number is short of the target. Not sure why.
The real problem is the verified links in the project pane shows on 3236 verified links and not 8385 was mentioned in the log. This is a huge discrepancy and I was wondering if anyone has faced this issue earlier.
Your thoughts?
Tagged:
Comments
status bar = stats for that day (all submissions / verifications)
number next to project = stats over all times (all submissions / verifications)
numbers in log = stats for submissions / verifications where URL was submitted (not for login/account creations)