Setting up automatic switching of project groups
I have 5 projects. Each project contains levels 1, 2, and 3. How do I set up group uploads? For example, I group all level 1 projects and run them. Once 100 triggers are reached, all level 1 projects are paused, and the level 2 projects in the group are run automatically, and so on. How do I set up this automatic upload?
Tagged:
Comments