Scheduler
rastarr
Thailand
Hi,
Is there a way to run some projects 24/7 and the remainder using the scheduler?
Reason - I'd prefer to run my scraping projects all the time while the rest are (I think) a small enough number to adequately utilise the scheduler.
I've looked but couldn't figure out if this is possible.
Is there a way to run some projects 24/7 and the remainder using the scheduler?
Reason - I'd prefer to run my scraping projects all the time while the rest are (I think) a small enough number to adequately utilise the scheduler.
I've looked but couldn't figure out if this is possible.
Tagged:
Comments