Skip to content

Bug with pause timer if SER is stopped or project is set to inactive.

shaunshaun https://www.youtube.com/ShaunMarrs
Afternoon Sven,

I have noticed that my projects will be posted as required but if a project is set to inactive then back to active or SER is stopped then started, the pause project after x submissions every x days setting seems to be ignored.

For example, a project is meant to post once every day, it will post, 10 minutes later I stop SER to update it or something and then press start. The project posts again instead of waiting until the next day.

Cheers

Shaun

Comments

  • SvenSven www.GSA-Online.de
    this should not happen. can you send me some kind of project to debug on? I can test that only after holidays however.
  • shaunshaun https://www.youtube.com/ShaunMarrs
    Yea no problem I will sent it to santos on Skype to pass to you for when you get back.
  • shaunshaun https://www.youtube.com/ShaunMarrs
    Sent everything with santos along with some details for some test domains.

    Its pretty much the same thing I reported in this thread a while back but im sure it was working fine after I reported it that time. Just repeated the same test from the video in that thread and its the exact same thing happening.
  • Has anyone found a solution to this problem. Today i set a project to make 10 submissions before pausing for a day. I come home from a day out with friends to find 353 verified links for the project. This is a tier one property, so i am in panic mode right now.
  • shaunshaun https://www.youtube.com/ShaunMarrs
    I decided to use the scheduler via the dropdown arrow near the start button to control the daily link output until it is fixed.
Sign In or Register to comment.