Dripping With Both Submitted and Verified Options?
I would like to setup a project to drip up to a certain number of links a day, and then pause the entire project after x number of links have been verified (could end up being days or weeks from the start). Is this somehow possible? I have a very reliable auto-approve list so the majority of submissions should be posted.