Scheduler and Stopping After XXXX verifications
Hey @Sven, I think the scheduler is messing up the stop after xxxx verifications. I have let a campaign run to 7000+ verifications and it was supposed to stop at 5000 verifications. The screenshot shows a campaign that I stopped manually, but I've let them run to see when they stop but they never do. Could the scheduler going every 30 minutes mess that up?
Comments