Skip to content

Does scheduler interferes with cutsom verification time?

edited April 2014 in Need Help
If I set total 2 projects in scheduler to change every, say, 30 minutes, with 1 active at a time, and in Options I set Custom verification time to, say, 90 minutes, does it mean Project A will be verified in 90 minutes time or in 150 (when his 90 minutes really ended) from the start?

Comments

  • SvenSven www.GSA-Online.de
    the time it starts to verify depends on the date a site was added to the database, not the time a project is started.
Sign In or Register to comment.